NAVY's 7.5-Ton MUOS-4 Satellite Arrives in Florida for August Launch on Most Powerful Atlas-V

On June 28, MUOS-4, the next satellite scheduled to join the U.S. Navy’s Mobile User Objective System (MUOS) secure communications network, shipped to Cape Canaveral from Lockheed Martin’s satellite manufacturing facility in Sunnyvale, California. Launch is currently scheduled for no earlier than August 27. Photo Credit: Lockheed Martin

On June 28, MUOS-4, the next satellite scheduled to join the U.S. Navy’s Mobile User Objective System (MUOS) secure communications network, shipped to Cape Canaveral from Lockheed Martin’s satellite manufacturing facility in Sunnyvale, Calif. Launch is currently scheduled for no earlier than Aug. 27. Photo Credit: Lockheed Martin

The fourth in a Lockheed Martin-built, […]

NAVY's MUOS-3 Relocates for On-Orbit Operations as MUOS-4 Prepares for Late-Summer Launch

MUOS-4, the next satellite scheduled to join the U.S. Navy’s new MUOS secure communications network later this year, is in final assembly and test at Lockheed Martin’s satellite manufacturing facility in Sunnyvale, California. Photo Credit: Lockheed Martin

MUOS-4, the next satellite scheduled to join the U.S. Navy’s new MUOS secure communications network later this year, is in final assembly and test at Lockheed Martin’s satellite manufacturing facility in Sunnyvale, Calif. Photo Credit: Lockheed Martin

The third in a Lockheed Martin-built five-ship fleet for a next-generation, narrowband tactical military satellite communications system was […]

NASA Begins Testing of InSight Mars Lander for Launch in 2016

Testing of the solar arrays on the InSight lander at Lockheed Martin Space Systems in Denver. Photo Credit: NASA/JPL-Caltech/Lockheed Martin

Testing of the solar arrays on the InSight lander at Lockheed Martin Space Systems in Denver. Photo Credit: NASA/JPL-Caltech/Lockheed Martin

While Curiosity and Opportunity are still busy roving Mars, NASA has begun testing its next lander, InSight, scheduled to launch in March 2016. It will be the first mission devoted to studying the interior of […]

After EFT-1, Orion Crew Module Subjected to Intense Heat Shield Inspection

Engineers from NASA’s Ames Research Center in Moffett Field, California, and NASA’s Marshall Space Flight Center in Huntsville, Alabama, remove segments of a heat-resistant material called Avcoat from the surface of the Orion heat shield, the protective shell designed to help the next-generation crew module and its future occupants withstand the heat of atmospheric […]

ULA Names Vulcan as America's Next Generation Reusable Rocket Family

CEO of United Launch Alliance, Tory Bruno, announces the name of the Next Generation Launch System rocket at the 31st Space Symposium in Colorado Springs. Photo Credit: Talia Landman/AmericaSpace

CEO of United Launch Alliance, Tory Bruno, announces the name of the Next Generation Launch System rocket at the 31st Space Symposium in Colorado Springs. Photo Credit: Talia Landman/AmericaSpace

United Launch Alliance (ULA) CEO Tory Bruno unveiled the next generation Vulcan Rocket at the 31st Space Symposium in Colorado Springs. The Next Generation Launch […]

NASA Partners With Commercial Industry to Advance Deep Space Exploration Capabilities

A view of the space habitat at night, docked with the Space Exploration Vehicle. This photo was taken during the 2010 Desert RATS field testing, from Aug. 31 - Sept. 15, 2010, in Black Point Lava Flow, Ariz. Image credit: NASA

A space habitat at night, docked with a “Space Exploration Vehicle.” This photo was taken during the 2010 Desert RATS field testing, from Aug. 31 – Sept. 15, 2010, in Black Point Lava Flow, Ariz. Image credit: NASA

This week, NASA announced the selection of 12 partnerships within the commercial industry to help develop the […]

Spacecraft Assembly Begins for NASA's OSIRIS-REx Asteroid Sample Return Mission

Artist concept of OSIRIS-REx, the first U.S. mission to return samples from an asteroid to Earth. Image Credit: NASA/Goddard

The first United States mission in history to launch a robotic spacecraft to an asteroid, retrieve samples, and return those samples back to Earth for study just passed a big milestone in its development this […]

Landing Region Chosen for InSight at T-Minus One Year to Red Planet Launch

In the weeks after NASA’s InSight mission reaches Mars in September 2016, the lander’s arm will lift two science instruments off the deck and place them onto the ground. This image shows testing of InSight’s robotic arm at JPL about two years before it will perform these tasks on Mars. Credit: NASA/JPL-Caltech

At T-minus […]

Orion: Lessons Learned on EFT-1 and Moving Forward to EM-1

Whole capsule view of Orion heat shield and compression pads during homecoming event for NASA’s first Orion spacecraft after returning to NASA’s Kennedy Space Center in Florida on Dec. 19, 2014. Orion launched successfully on Dec. 5, 2014 and was recovered from the Pacific Ocean by the U.S. Navy . Credit: Ken Kremer/kenkremer.com/AmericaSpace

Contractors […]

NASA Alters Orion Heat Shield for 2018 Flight With Advanced 3-D Thermal Protection Fabric Needed for Destination Mars

NASA Administrator Charles Bolden (left) holds Orion EM-1 3-D woven heat shield hardware produced by Bally Ribbon Mills of Bally, Penn. With Bolden are Mark Harries and Ray Harries, Marketing Executive and President of Bally Ribbon Mills, and Mike Gazarik (Associate Administrator STMD) and Glenn Delgado (Head small business) of NASA at media briefing […]