First SLS Work Platform Installed in KSC's Vehicle Assembly Building High Bay 3

From NASA: “Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the 325-ton crane lifts the first half of the K-level work platforms up for installation in High Bay 3 on Dec. 22. The platform will be secured into position on tower E, about 86 feet above the floor.” Photo Credit: […]

Capping A Milestone Year, NASA Announces Completion of SLS Critical Design Review

From NASA: “For the first time in almost 40 years, a NASA human-rated rocket has completed all steps needed to clear a critical design review (CDR). The agency’s Space Launch System (SLS) is the first vehicle designed to meet the challenges of the journey to Mars and the first exploration class rocket since the […]

NASA and Industry Teams Set for Orion Launch in 2014 and SLS First Flight in 2017

Flying in its ‘Block I’ configuration, with four Space Shuttle-era Main Engines, a pair of five-segment Solid Rocket Boosters and a Delta-derived interim Cryogenic Propulsion System (iCPS), the first flight of the Space Launch System (SLS) in December 2017 will despatch the first crew-capable vehicle to the Moon since the Apollo era. Image Credit: […]