AmericaSpace Mission Tracker

Next Launch WGS 5 on a Delta 4 - Medium rocket from Cape Canaveral AFB, FL scheduled for 25 May 13 0:27:00 GMT

Launch
Days
Hrs
Min
Sec
Click here for more details...

Enter your email address to subscribe to AmericaSpace and receive notifications of new posts by email.

Orbital Readies For 'A-ONE' Test Flight

The first launch of an Orbital Science Corporation's Antares rocket is scheduled to take place between Apr. 16-18. Image Credit: Orbital

The first launch of an Orbital Science Corporation’s Antares rocket is scheduled to take place between Apr. 16-18. Image Credit: Orbital

Orbital Sciences (OSC) is readying Antares, its medium-class launch vehicle, for its first Commercial Orbital Transportation Services (COTS) test flight, “A-ONE”, currently scheduled to take place between April 16 and 18, from Pad 0A at NASA’s Wallops Flight Facility. This launch will seek to validate the Antares rocket. It will not carry an actual Cygnus cargo spacecraft but will instead have mass to simulate as if it were carrying a Cygnus. A successful launch of Antares will set the stage for Orbital’s next launch that would include a Cygnus mission to International Space Station (ISS).

Originating from Orbital’s new Wallops launch facility, Pad 0A, the mission will boost this simulated payload to a target orbit of 250 km x 300 km with an inclination of 51.6 degrees. Wallops Pad 0A is part of the Virginia Commercial Space Authority’s Mid-Atlantic Regional Spaceport (MARS). The mission’s objective  is to demonstrate the viability of the Antares launch system from roll-out of the rocket from its integration facility, through setting it up on the pad, fueling, to launch and delivery of the payload into orbit.

NASA Wallops Pad 0A (Credit: Orbital Sciences 2013)

NASA Wallops Pad 0A (Credit: Orbital Sciences 2013)

The test launch will be the final hurdle Orbital has to complete before the company can demonstrate its cargo-delivery capabilities to the ISS under the NASA COTS agreement. Following the successful completion of the COTS requirements, Orbital is slated to deliver up to 10 metric tons of supplies to the station under the Commercial Resupply Services (CRS) contract with NASA.

Under the joint NASA/Orbital COTS agreement, Orbital is developing the Cygnus cargo vessel, which must meet the strict safety requirements for station operations. Much like the other company that was awarded a COTS contract, SpaceX, Orbital is developing their rocket to also be used to deliver medium-class payloads to low-Earth-orbit. Unlike Orbital, SpaceX has already completed the COTS requirements and has moved on to the CRS contract. Currently a SpaceX Dragon spacecraft is berthed to the International Space Station.

Antares Medium-Class Launcher (Credit: Orbital Sciences, 2013)

Antares Medium-Class Launcher (Credit: Orbital Sciences, 2013)

Under the CRS contracr, Orbital is required to conduct eight resupply flights to the ISS between 2013 and 2015 and deliver 10 metric tons of cargo to the crew stationed there. Unlike the SpaceX Dragon vehicle, Cygnus is not designed to return to Earth. When it has completed its mission and be re-filled with waste, the vessel will be directed back into Earth’s atmosphere where it will burn up.

Posts associated with the COTS mission

  • Smartphone Photos From Orbit
  • Third Time’s the Charm for Orbital’s Antares
  • Early Umbilical Separation Prompts Antares Launch Scrub
  • Orbital’s Antares Rocket Rolls Out to Pad in Preparation for First COTS Mission
  • SpaceX’s Musk Talks Preparing to Recover Falcon 9 First Stage, Crewed Efforts, and More
  • NASA, SpaceX Hail Latest Cargo Mission to ISS
  • Orbital Readies For ‘A-ONE’ Test Flight
  • SpaceX Conducts Fourth Successful Grasshopper Launch, Doubles Previous Altitude
  • NASA Official Describes Commercial Crew and Its Importance to Human Space Exploration
  • Video Cameras Get Creamed by SpaceX Falcon 9 Rocket Plume
  • Photo Feature: The Falcon and the Dragon
  • Dragon Breathes Perfect Fire as CRS-2 Roars to Orbit -UPDATE
  • Sequestration to Squash Commercial Crew?
  • Next SpaceX Dragon Spacecraft on Track for March 1 Launch
  • Launch Viewing Guide for SpaceX Falcon 9
  • Orbital Successfully Hot Fires Antares Rocket, Tests New Pad at Wallops
  • Orbital Aborts Test Fire of Antares Rocket
  • Aerojet Successfully Test Fires AJ26 Engine
  • ESC Empowers Part 1: The People that Make the Magic
  • Canaveral’s Hidden Treasure: The Cape Canaveral Air Force Station Public Tour
  • Looking Back-Looking Forward: 50 Years with NASA
  • Next SpaceX Commercial Resupply Flight Delayed
  • SpaceX’s Launch Anomaly Wasn’t Only Flaw on CRS-1
  • On @ The 90: The Future
  • SpaceX’s CRS-1 Mission Concludes With Splashdown!
  • Expedition 33′s Crew Tames the Dragon
  • Falcon 9 Engine-Out Anomaly Raises Concern and Relief
  • Falcon 9 Flies as SpaceX Hits the Spot…Again
  • Launch Viewing Guide: SpaceX Falcon-9 Rocket GO For Launch Sunday Evening
  • Orbital’s Antares Takes Key Step Toward Maiden Launch
  • ULA and SpaceX Rocket Engines to Rattle the Cape This Week
  • SpaceX’s Next ISS Resupply Mission is Set
  • Review: SpaceX’s Falcon 9 and Dragon Flying Model Rocket Kit
  • Bolden Highlights Commercial Partners’ Efforts
  • Another Piece of Shuttle History Leaving Cape Canaveral
  • Opinion: One Year Later Finds Shuttle Workers Still Struggling
  • Visiting Vehicles in the Fast Lane
  • Dragon By The Tail: Video Highlights SpaceX’s Recent Mission
  • Antares Rising: Orbital’s New Booster Joins NASA Line-Up
  • SpaceX Moves Ahead With Merlin 1D Full-Duration Firing
  • SpaceX Achievement Leads the Way to a Brighter Future
  • Under the Dragon’s Wing: Commercial Spacecraft Completes Historic Mission
  • The Dragon is Coming in for a Landing
  • Hawks and Falcons: Covering the SpaceX COTS-2 Launch with the 920th Rescue Wing
  • Dragon Opened By Expedition 31 Crew
  • Dragon Becomes First Private Spacecraft To Berth With ISS
  • Rising Star: Falcon 9 Launches Dragon Spacecraft To ISS
  • No Launch Today For Falcon 9
  • SpaceX Falcon 9 Launch Viewing Guide
  • NASA’s Makes Room for SpaceX Falcon 9 in NLS II Contract
  • 5 comments to Orbital Readies For ‘A-ONE’ Test Flight

    Leave a Reply

      

      

      

    You can use these HTML tags

    <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>